What to check first
Before you dive into details, check the basics:- what Roomote was asked to do
- which environment or repository context it used
- whether the task is still running, needs input, or has finished
- whether Roomote used the expected model, source-control context, and compute environment when those details matter
- whether the end state matches the kind of outcome you wanted: answer, plan, patch, branch, or PR
Task view
The task view gives you the working context for a run:- conversation history and Roomote updates
- terminal and runtime logs
- generated artifacts
- code diffs
- previews for running apps
- task metadata and links back to the surface that started the task
Review the evidence
Roomote is most useful when it can show its work. For implementation tasks, look for:- commands, tests, or checks it ran
- logs or errors it used to make decisions
- screenshots or live previews for UI changes
- a diff or pull request for code changes
- a clear explanation when something could not be verified
| Surface | What to look for |
|---|---|
| Transcript | Whether Roomote understood the ask, adapted to new context, and explained blockers clearly |
| Terminal and logs | The concrete commands, errors, and runtime signals behind the final answer |
| Diff or PR | Whether the actual code change matches the requested outcome |
| Preview | Whether the visible result matches the claim for UI or workflow changes |
| Artifacts | Plans, reports, screenshots, or other outputs you may want to reuse or review |
Continuing work
You can send follow-up instructions while a task is active. If a task has completed and Roomote has a restorable snapshot, a follow-up can resume from that prior workspace instead of starting over. Good follow-ups are specific:- “Apply the second option and add a regression test.”
- “Use the existing settings card pattern instead of adding a new component.”
- “Open a PR with the fix.”
- “Explain the tradeoff before changing code.”
When to resume versus start a new task
- Resume the same task when the follow-up depends on the existing workspace, context, or unfinished implementation.
- Start a new task when the work is a separate objective, should use a different environment, or would make the current task thread too broad.